Home · Learn · ATCE · Status ledger

ATCE status ledger, as of 2026-11-09

Every ATCE capability with one of three markers. The site-wide status ledger uses the same markers for everything else.

Short answer

Measured 2026-11-12, the every-transfer rule is not in the validator image created 2026-08-21. That image can deny a crossing. The other rows in this table were not confirmed on that image. The production record store and the InterOp router are Designed.

What does each marker mean?

The markers are the same on every page of this site. Each means one thing.

MarkerMeaning
LiveRunning in production on jil-mainnet-2 or on this public site today.
BuiltCode merged and tested, and not the process sealing blocks.
DesignedWritten down as a design and on the roadmap.

The live chain is jil-mainnet-2: genesis 2026-08-21, ten validators, all operated by JIL Sovereign Technologies Incorporated at one hosting provider. The consensus engine is self-written. Johanson Group LLP is examining SOC 2 Type 1. Trust Services Criteria in that examination are Security only. No report has been issued. SOC 2 Type 2 and the HIPAA examination are not started. HITRUST r1 has no external assessor and no report.

What is the status of every ATCE capability?

Sixteen capabilities, each with its marker on 2026-11-09.

CapabilityStatus on 2026-11-09What that means
Ruling on every transferBuiltThe rule that ATCE rules every transfer was committed on 2026-11-01 and is not in the validator image created 2026-08-21. That image can deny a crossing.
Both-party ruleBuiltAn account-to-account move is ruled on both accounts. A restricted sender paying an unrestricted recipient is held, and the reverse is held too. This row was not confirmed on the validator image created 2026-08-21.
Zone ruleBuiltValue moves only when sender and recipient are in the same zone or the profile allows the crossing. An unzoned account counts as no zone (reason code 13). This row was not confirmed on the validator image created 2026-08-21.
Release refused without ATCE contextBuiltA corridor release that arrives without an ATCE context is refused. This row was not confirmed on the validator image created 2026-08-21.
Per-asset limitsBuiltA site sets a limit per asset that replaces the default limit, and a limit of 0 permits no transfer of that asset. The limit is part of the ruling. This row was not confirmed on the validator image created 2026-08-21.
Attested identity recordsBuiltThe ruling reads signed on-chain identity records for both parties, including the sanctions flag, instead of facts the act supplies. This row was not confirmed on the validator image created 2026-08-21.
AttesterBuiltTurns the KYC and KYB result, and the off-chain sanctions screen, into a signed identity record. An act without an attested identity record is denied (reason code 8). This row was not confirmed on the validator image created 2026-08-21.
Reviewer bridgeBuiltAsks the review service about one specific act and signs the answer in the shape the chain records. An act without a pre-ruling review result is denied (reason code 9). This row was not confirmed on the validator image created 2026-08-21.
Record writerBuiltFiles the full ATCE record under the ruling hash. The chain references that hash. This row was not confirmed on the validator image created 2026-08-21.
Agentic reviewBuiltHold-only. It can deny an act the rules passed, which public copy calls a hold (reason code 10). A person decides what happens next, outside the review, and the sender then submits a new act. It cannot release an act the rules denied. This row was not confirmed on the validator image created 2026-08-21.
Cell-level armingBuiltThe one-way enforcement marker was committed on 2026-11-01. It is not in the validator image created 2026-08-21. Arming another cell takes a coordinated validator upgrade with that cell operator.
Record store and 10 year retentionDesignedRetention of 10 years from creation is a commitment. Storage for the record of each site is allocated when its license is signed.
Versioned policy tableDesignedA change appends a new policy number and never rewrites a number already named. Re-reading a past transfer from the table is part of this design.
Corridor journalDesignedThe Layer-1 trust record of policy text and transaction for a corridor hop. The record a past transfer can be re-read from is part of this design.
InterOp routerDesignedMulti-hop path planning across sites and rails. The router plans ATCE-legal hops, and each hop has its own ruling.
Negotiated per-hop ratesDesignedRates agreed in a license, at or below the published rate. The published corridor rate of 5 basis points applies today; see the fee page.

The ruling has two outcomes, allow or deny. A deny that waits for a person, because the review denied the act (reason code 10) or the review result is missing (reason code 9), is called a hold in public copy.

How does a sovereign domain go live?

A sovereign domain goes live when its policies are written and pinned. The sovereign writes its identity levels, jurisdiction zones, sanctions lists, limits and policy. The policy is pinned, and ATCE enforces it from that domain's first transfer. Storage for the domain's record, with a retention commitment of 10 years from creation, is allocated when the domain's license is signed.

What happened, and when?

The ATCE timeline below is taken from the merge history and the design documents. Dates are the dates those sources give.

DateEvent
2026-07-02The core ATCE engine is recorded as built and tested, and integrated as the arrival gate for value crossing between cells.
2026-08-21The chain jil-mainnet-2 is genesised.
2026-11-01The ruling change merges (pull request 5971): the native transfer, token transfer and currency transfer paths are ruled, both parties are ruled, and every ruling carries a unique hash.
2026-11-01The off-chain services merge (pull request 5973): the attester, the reviewer bridge and the record writer. A move of the review service to the record store merges the same day (pull request 5989).
2026-11-01The founder records the InterOp decisions: a hop limit of 10, no partial-finality mode in the first release, and a flat negotiated per-hop rate at or below 5 basis points.
2026-11-07The operator business paper states the hosted-domain commercial framework: setup of $100,000 one time, an annual floor of $250,000, credited against JIL's share of collected transport fees, no extra charge for hubs or annexes, and a corridor minimum of 5 basis points of settled gross. The schedule is on the fee page.
2026-11-09Status markers aligned site-wide to Live, Built, and Designed.

What is on the roadmap?

  1. The production record store. Storage for each site's record is allocated when that site's license is signed.
  2. The versioned policy table and the corridor journal, so that a past transfer can be re-read from them.
  3. The hold and escrow transaction types the InterOp design needs, then the InterOp router.
  4. Connections to other chains and payment rails, one connector at a time. The Ethereum bridge deposit path is Live; its withdrawal path awaits a key ceremony.
  5. Issued SOC 2 and HIPAA reports from the Johanson Group LLP examinations, and a HITRUST engagement.

Questions about ATCE status

How does ATCE rule a transfer?

Before value moves, on both counterparties, from signed identity records and the pinned policy, with a hold-only agentic review as an input. The rule that ATCE rules every transfer was committed on 2026-11-01 and is not in the validator image created 2026-08-21. That image can deny a crossing. Measured 2026-11-12, eight validators are in the signing set and ten hosts are operated by JIL. The record store and InterOp are Designed.

What is the ruling?

The verdict, allow or deny, with a reason code and a unique SHA-256 hash that binds the profile, both parties' records, the review result, and the outcome. The chain holds the hash; JIL holds the full record.

What does the agentic review do?

It can hold an act and cannot release a denial. A hold is a deny: a person decides what happens next, outside the review, and the sender then submits a new act.

What is the status of the 10 year record store?

Designed. The retention of 10 years from creation is a commitment, and the production record store is designed. Storage for each site's record is allocated when that site's license is signed.

How does ATCE handle sanctions?

ATCE denies a transfer when either party's attested sanctions flag is set. The screen against live lists runs off chain in the attester, and its result is signed into the identity record, because a ruling inside consensus cannot call an outside service.

What examinations are in progress?

Johanson Group LLP is examining SOC 2 Type 1. Trust Services Criteria in that examination are Security only. No report has been issued. SOC 2 Type 2 and the HIPAA examination are not started. HITRUST r1 has no external assessor and no report. Yes. ATCE is patent pending. So is ACL, and so are all 177 patent claims.