Short answer
ATCE, the Adaptive Trust, Compliance and Execution Engine, is the part of the JIL Layer-1 that rules on every transfer before value moves. A ruling is allow or deny, with a reason code and a SHA-256 commitment that references the record. Enforcement, the attester and the agentic review rule before value moves. Yes. ATCE is patent pending. So is ACL, and so are all 177 patent claims.
The block that carries a ruling is sealed by the process on the hosts. Measured 2026-11-12, that process is jil-abci-node under a third-party consensus engine. The Attested Consensus Layer binary is not that process. Read how a block seals, and how a block seals.
What is ATCE?
ATCE is the engine that makes JIL a trust before it is a payment network. It runs inside consensus, so a transfer is ruled before it settles and not reviewed after the money has moved. A licensee governs a sovereign domain, a nation, a commodity desk such as oil or gold, an industry network, or a financial institution, and chartered entities may publish its local bylaws: identity levels, jurisdiction zones, sanctions, limits and policy. ATCE enforces the published rule. It does not write it. ATCE applies them to both parties of every account-to-account move, and to every hop that leaves the domain.
The rule that defines it is short. No transfer moves value outside an ATCE ruling. The verdict on an act that stays inside the domain is a domestic ruling. The verdict on a hop that leaves the domain is a corridor ruling. A domestic ruling stays between the Tier 1 root and its annexes, and a corridor ruling covers every hop that leaves the domain. The provisioned chain is a sovereign cell. A release without an ATCE context is refused.
ATCE is not a promise that the rules are right. The rules belong to the sovereign. ATCE makes them apply to every transfer, records the outcome with a unique hash, and lets a second look challenge the rules before the final ruling.
What is live today?
Status, 2026-11-12. The table uses the same three markers as the rest of the site: Live, Built, and Designed. The ATCE status ledger lists every capability one by one, and the site status ledger covers everything else.
| Marker | What it covers |
|---|---|
| Live | The chain jil-mainnet-2 is producing blocks. Measured 2026-11-12, the signing set is eight and the process is jil-abci-node under a third-party consensus engine from the image created 2026-08-21. The rule that ATCE rules every transfer was committed on 2026-11-01 and is not in that image. |
| Built | Code merged and tested that is not the process sealing blocks. The rule that no transfer moves outside an ATCE ruling, on both parties, was committed on 2026-11-01. It is not in the validator image created 2026-08-21. That image can deny a crossing. |
| Designed | The production record store, with retention of 10 years from creation committed with each sovereign domain when its license is signed. The InterOp router for multi-hop paths. Negotiated per-hop rates. |
A sovereign domain goes live when its own policies are written and pinned. The repository rule is that ATCE enforces them from its first transfer. Measured 2026-11-12, that rule is not in the validator image created 2026-08-21. That image can deny a crossing. The consensus engine is self-written. Johanson Group LLP is examining SOC 2 Type 1. Trust Services Criteria in that examination are Security only. No report has been issued. SOC 2 Type 2 and the HIPAA examination are not started. HITRUST r1 has no external assessor and no report. Read Verification for what an outside party can and cannot check.
Why can a transfer pass every rule and still be stopped?
Because rules only catch what someone thought to write down. An act can satisfy every rule and still look wrong: an unusual pattern, a counterparty that fits no known category, a sequence of small moves that adds up to something else. ATCE calls an agentic review before its final ruling. The review challenges the rules. It can hold an act. It cannot release one that ATCE denied, and a hold is a deny: a person decides what happens next, and the sender then submits a new act.
In the repository rule, the review service and its bridge to ATCE rule before value moves. Measured 2026-11-12, that review was not confirmed on the validator image created 2026-08-21. An act without a review result is denied (reason code 9). Read The agentic review.
What is in this section?
Thirteen pages, each answering one question in full. Start with the ruling, then follow the order, or jump to the status ledger if you need the facts and dates first.
The ruling
What a ruling is: the inputs, the outcomes allow and deny, the reason codes, and the SHA-256 commitment that references the record.
Identity and attestation
The identity facts ATCE reads, how the attester puts them on chain, and what happens when one is missing.
Two layers
Where ATCE applies: a domestic ruling inside a sovereign domain, and a corridor ruling on a hop that leaves it.
Policy and activation
Who writes the rules, the policy word, versioning, and the one-way enforcement switch.
The agentic review
The second look that challenges the rules. It can hold an act and cannot release a denied one.
The record
The unique hash, the write-once record JIL holds, the corridor journal, and the 10 year retention commitment.
Limits and currencies
Per-asset limits, Currency Objects, the currency site, and how ATCE gates a currency.
Refusals and failure modes
Every reason code, what a hold is, and what happens when something is missing or down.
Verification
What an outside party can check today, what it cannot, and what to ask for.
Status ledger
Every ATCE capability with its dated status: Live, Built, or Designed.
Glossary
Every term in the section, defined in plain words.
Questions and answers
Fifty or more questions, answered straight, including the hard ones.
ATCE compared
How ATCE differs from other ways value movement is checked, by category.
The shorter overview is ATCE in one page. The long argument is in the white paper and the Corridor Journal.
Key facts
| Fact | Value |
|---|---|
| Full name | Adaptive Trust, Compliance and Execution Engine (ATCE) |
| What it does | Rules on an act before value moves: allow or deny, with a reason code and a SHA-256 commitment |
| Where it applies | A domestic ruling inside a sovereign domain, and a corridor ruling on a hop that leaves it |
| Chain | jil-mainnet-2, genesised 2026-08-21. Measured 2026-11-12, eight validators in the signing set, operated by JIL Sovereign Technologies Incorporated |
| Enforcement | Built. Committed 2026-11-01. Not in the validator image created 2026-08-21 |
| Record | Write once, read many, unique hash per ruling, identity details in the encrypted record and attestation values only on chain, 10 years of retention committed |
| Review | Agentic review that challenges the rules. Built. Not confirmed on the validator image created 2026-08-21. Hold only, a hold is a deny, and a person decides what happens next. |
| Audit | Johanson Group LLP is examining SOC 2 Type 1. Trust Services Criteria in that examination are Security only. No report has been issued. SOC 2 Type 2 and the HIPAA examination are not started. HITRUST r1 has no external assessor and no report. |
| Intellectual property | ATCE, ACL, and all 177 patent claims are patent pending. Nothing is granted. |
| Operator | JIL Sovereign Technologies Incorporated |
Who is this section for?
Regulators and supervisors who need to know what a ruling is and what it leaves behind. Central banks and ministries weighing a sovereign domain. Banks and regulated institutions that need policy enforced before settlement. Technical evaluators who want the mechanism, the wire format and the honest gaps. Journalists and analysts who want facts with dates on them.
Questions about ATCE
What is ATCE?
ATCE is the Adaptive Trust, Compliance and Execution Engine. It is the part of the JIL Layer-1 that rules on an act before value moves, producing a verdict (allow or deny; a deny that waits for a person is called a hold), a reason code and a SHA-256 commitment that references the record JIL keeps.
How does ATCE rule a transfer?
The repository rule, committed 2026-11-01, rules a transfer before value moves. It is not in the validator image created 2026-08-21. Measured 2026-11-12, eight validators are in the signing set. JIL holds the record commitment for 10 years from creation. The status ledger lists every capability.
Can a transfer pass every rule and still be stopped?
Yes, by design. ATCE calls an agentic review that challenges the rules, because an act can satisfy every rule and still look wrong. The review can hold an act. It cannot release an act that ATCE denied, and a hold is a deny: a person decides what happens next, and the sender then submits a new act.
How long is the record kept?
JIL commits to keep the transaction record for 10 years from creation, then releases it. Ten years is the maximum. It is a commitment: storage capacity is allocated for each sovereign domain when its license is signed, and the production record store is designed.
What examinations are in progress?
Johanson Group LLP is examining SOC 2 Type 1. Trust Services Criteria in that examination are Security only. No report has been issued. SOC 2 Type 2 and the HIPAA examination are not started. HITRUST r1 has no external assessor and no report. JIL does not claim that the chain has no backdoors. It states the rule: no transfer moves value outside an ATCE ruling.
Is ATCE patent-pending?
Yes. ATCE is patent pending. So is ACL, and so are all 177 patent claims. No patent has been granted.
More answers are on the full question and answer page.
Evaluating a cell?
A briefing covers the license, the security as built, and a pilot cell design. Ask for the verification path.
